Live Hot Water Metering for Commercial Buildings
Live Hot Water Metering for Commercial Buildings
Awards & recognition
Six industry award finals and wins for our live water metering, recognised for the work we put in behind the scenes.
How our metering service works
Getting an installation team on site is the first step. A data logger is fitted to your existing hot water system, usually without any disruption to the building, and left in place to record actual draw off patterns over a set monitoring period rather than relying on assumptions or a plate on the old boiler.
What our metering can tell you
Are you are planning a new hot water system or still at the evaluation stage, Adveco’s metering service provides accurate data to answer the questions that matter most.
-
Gas or electric? Decide whether your new system should remain gas-fired or go fully electric, based on actual demand and electrical supply capacity.
-
Renewable integration Which renewable technologies are appropriate and what return would be realistic given your consumption profile.
-
Backup and redundancy Whether your new system needs backup capacity to cover peak demand or primary system downtime.
-
Accurate system sizing How large your new system really needs to be and whether your electrical infrastructure can support it without upgrade.
Metering cost and service incentive
London Fire Brigade
Adveco provided live hot water metering data as part of a planned decarbonisation project for the London Fire Brigade. By accurately metering consumption before new systems were specified, the LFB were able to confirm correct system sizing and get an accurate picture of the carbon and cost savings they would achieve by upgrading.
Contact Us
Frequently Asked Questions
A service that fits a temporary data logger to your existing hot water system, capturing real consumption data before any new equipment is specified. Rather than sizing a replacement on assumptions or the rating plate of the old system, the recommendation is based on how the building actually uses hot water.
Four steps: an Adveco engineer visits and installs the meter non-invasively, the meter uploads consumption data at 6-minute intervals throughout the monitoring period, Adveco removes the meter within the month and analyses the data, then you receive a bespoke recommendation report.
No. The meter is fitted non-invasively to the existing system with no disruption to hot water supply, and the same applies when it’s removed.
Adveco removes the meter within the month of installation, having captured continuous 6-minute interval data throughout that period.
Required kW output, storage size, temperatures, projected annual consumption (kWh), and projected carbon and cost figures, plus answers to the bigger decisions: whether to stay on gas or move to electric, which renewable technologies suit your consumption profile, whether you need backup or redundancy capacity, and whether your existing electrical infrastructure can support a new system without an upgrade.
It’s charged as a set consultant engineer fee. If you go on to purchase a recommended system from Adveco, a proportion of that fee is deducted from the new system price.
No, it’s designed for either stage, whether you’re planning a new system already or still evaluating your options, the data is the same either way and helps you decide rather than assuming the decision’s been made.
Yes. Adveco used it as part of a planned decarbonisation project for the London Fire Brigade, confirming correct system sizing, electrical headroom, and projected carbon reduction before any capital was committed.
Why Choose Adveco
50 Years
Adveco Ltd. is the independent hot water specialist for the commercial built environment and has historically traded as A.O. Smith Water Heaters in the UK.
Highest quality products and services
We prioritise our clients’ needs to deliver bespoke, practical systems.
Full aftersales support
Maintenance and service packages, commissioning, spares, warranty and technical support for your application.