First Response
/in Case Studies, CHP (Combined Heat and Power), Energy, Heating, Hot Water, Packaged Plant Adveco, AO Smith Water Heaters, Boilers, buffer tanks, combination heat and power, combined heat and power CHP, DHW, domestic hot water, London Fire Brigade, mCHP, MD, micro CHP, TOTEM Case StudiesCase Studies: First Response (London Fire Brigade)
London Fire Brigade
London Fire Brigade is one of the largest firefighting and rescue organisations in the world, it is also the busiest of all the fire services in the United Kingdom. Since its formal existence began in 1866, its work has grown exponentially, receiving more than 170,000 emergency calls each year, approximately 20,000 of which relate to fires across the Greater London region.
In addition to the role of firefighting, the Brigade provides home fire safety visits and responds to a range of emergency scenarios from flooding, road traffic accidents and major incidents, and animal rescues. It is also a statutory consultee as part of the building regulations process for fire safety design.
Requiring a bespoke approach to each and every site, Adveco works closely with London Fire Brigade
To support these and many other activities, the Brigade employs more than 5,000 operational firefighters based out of more than 100 stations. Those stations range from new, modern, purpose-built sites to listed buildings constructed more than a century ago. Despite the variety of buildings all have an operational need for 24/7 hot water and heating to support the shift-based crews. London Fire Brigade, therefore, needs access to a range of products and services to support varied legacy systems as well as new projects throughout Greater London.
Requiring a bespoke approach to each and every site, Adveco works closely with London Fire Brigade, providing initial site review and system design, which can incorporate A.O. Smith water heaters, or appliances from its own range of boilers for heating. Projects in the past five years have seen new installations completed in more than 50 stations and the work continues today.
Adveco is very proud to be able to continue to support the capital’s firefighters by helping to create comfortable, efficient, functional, safe and sustainable stations through the design, supply, commissioning and service of business-critical hot water and heating.
Other case studies
Bromsgrove Leisure Centre
7,000 CHP run hours per year
Alexandra House Care Home
Estimated annual savings of £7,500
Packaged Plant Room
Boilers
Adveco Ltd. – Expertly Engineered For You
Design, supply and support for commercial hot water, heating and low carbon applications
Packaged Plant Room
/in Case Studies, CHP (Combined Heat and Power), Education Estates, Packaged Plant Case StudiesCase Studies: Adveco Packaged Plant Room for School
Adveco Packaged Plant Room for School
Learning a Valuable Lesson When Securing New Heating
Creating a modern, efficient, cost-effective, and sustainable hot water & heating system is not just advantageous, it is increasingly becoming a demand as the United Kingdom transitions towards a more environmentally friendly Net Zero nation by 2050. This process of modernisation can be especially challenging for school sites.
Adveco has designed and built a full prefabricated plant room at a school in Berkshire, providing the new school building with a modern hot water and heating system situated inside a self-contained rooftop plant room. Adveco’s packaged plant rooms are the easiest way to achieve the maximum potential within the limited space schools have available whilst also keeping costs and time of projects reduced with off-site construction.
Adveco’s Packaged Plant Rooms are the easiest way to achieve the maximum potential within the limited space schools have available.
Designed to address the heating and domestic hot water (DHW) demands of the building, the prefabricated GRP enclosure incorporates a complete, integrated system built around a cascade of seven A.O. Smith Upsilon UB 110 and UB140 condensing boilers. Installed in a side-by-side configuration on a supporting framework, the UB boilers are highly efficient (up to 110.3%), very low gas usage boilers with very low emissions (NOx class 5). Fitted with an intelligent control system, the boilers’ performance is optimised through a process of infinite modulation. The UB boiler was also an optimal choice for the school, with built-in redundancy ensuring system operation and continuity of service.
The plant room primary system also incorporates a bespoke Adveco MSS 2000 carbon steel buffer vessel. Carefully designed to fit any heating application that requires an inertia tank or energy storage vessel, this 2000-litre vessel provides multiple level tappings enabling compatibility with almost any heating application. Supporting multiple return flow temperatures or multiple heat sources, the MSS is perfect for integrating low or high-grade heaters, including renewables, to supply preheat and drive further sustainability from the system. With heating coils rated to 9 bar working pressure, the MSS is suitable for use with glycol fluids for solar thermal or heat pump installations. Designed to accept preheated water, the MSS 2000 connects to the Upsilon 110 cascade and the buildings heating system.
In this case, the demands for heating and hot water for an increasing number of pupils, combined with the limitations of incorporating large scale plant room space within the new building was a key issue. Typically, schools also face limitations in terms of when work can be carried out on site. If a works window is especially narrow it can preclude larger scale project work. Adveco supplied within the weatherproof enclosure the integrated cascade and thermal storage, alongside an expansion vessel, dosing pot, pipework, insulation, flueing and all controls ready to be craned into position. Final electrical and plumbing connections took a matter of days.
Working with Adveco helped the school achieve timely project delivery through proper co-ordination of application design, securing of equipment and controls and post-installation commissioning works. By relocating essential building services into this rooftop packaged plant room, not only were demands able to be met, but valuable internal areas could now be released within the school’s new building.
Other case studies
Five Guys
Five Guys Restuarant
Looks Matter
19th century grade II listed building
Bromsgrove Leisure Centre
7,000 CHP run hours per year
Adveco Ltd – Expertly Engineered For You
Design, supply and support for commercial hot water, heating and low carbon applications